PICP Natural Stone Patios Softscape Installation Invasive Species Management Land Clearing Commercial Turf Management Irrigation Pump Station Maintenance Ponds Seasonal Color Rotations Natural Stone Inlay Install Structural Retaining Walls Concrete Paving Hydroseeding Restoration Pipe Repair Weed Control 24/7 Zero-Tolerance Plowing Pressure Regulating Valve Installation Custom Irrigation System Design Overseeding Tree Ring Enclosure Water Feature Excavation Artificial Grass HOA Maintenance Backflow Prevention Testing Commercial Calibration Sealing Field Mowing Native Plant Design Hearths Irrigation System Retrofitting Bioswale Rain Garden Engineering De-Icing Optimization Pigmented Concrete Smart Central Control Systems Hedge Trimming Sidewalks Public Works Infrastructure Foundation Excavation Porter Services Hard Surface Maintenance Detention Ponds Relocation High-Volume Pumps Natural Boulder Retaining Walls Vegetation Management Creek Crossings Shrub Health Care Bi-Weekly Lawn Care Park & Playground Construction Approaches Energy Savings Architectural Accent Lighting Driveway Accents Slope Stabilization Removal Continuous Concrete Edging Fall Cleanups Cut/Fill Weather Station Annual Displays Integrated Pest Management (IPM) Bark Application Dust Control Bollard Light Installation Drainage Restoration Underground Utility Installation Athletic Field Construction Driveway Base Slip-and-Fall Mitigation Smart Controller Integration Flow Sensor Install Paths Reporting Chimneys Drip Irrigation Installation Security Perimeter Lighting Mower-Edge Profiles Textured Borders Revegetation Vegetated Green Roof Maintenance SWPPP Compliance Hedge Planting Automated Lighting Control Systems Right-of-Way Clearing Blow-Outs Disposal Utility Trenching Mulch Bed Pre-Emergent Weed Treatment Flatwork Full-Scale Landscape Design Dedicated Site Staging Segmental Block Retaining Walls Emergency Storm Response Repair Urban Beautification Native Prairie Meadow Restoration Septic System Site Prep Commercial-Grade Curbing De-Icing Redefining Custom Integrated Lighting Liquid Brine Pre-Treatment Bed Preparation Real-Time Weather Monitoring ADA Compliance Upgrades Valve Maintenance Bio-Retention Cell Maintenance Garden Bed Definition PICP Natural Stone Patios Softscape Installation Invasive Species Management Land Clearing Commercial Turf Management Irrigation Pump Station Maintenance Ponds Seasonal Color Rotations Natural Stone Inlay Install Structural Retaining Walls Concrete Paving Hydroseeding Restoration Pipe Repair Weed Control 24/7 Zero-Tolerance Plowing Pressure Regulating Valve Installation Custom Irrigation System Design Overseeding Tree Ring Enclosure Water Feature Excavation Artificial Grass HOA Maintenance Backflow Prevention Testing Commercial Calibration Sealing Field Mowing Native Plant Design Hearths Irrigation System Retrofitting Bioswale Rain Garden Engineering De-Icing Optimization Pigmented Concrete Smart Central Control Systems Hedge Trimming Sidewalks Public Works Infrastructure Foundation Excavation Porter Services Hard Surface Maintenance Detention Ponds Relocation High-Volume Pumps Natural Boulder Retaining Walls Vegetation Management Creek Crossings Shrub Health Care Bi-Weekly Lawn Care Park & Playground Construction Approaches Energy Savings Architectural Accent Lighting Driveway Accents Slope Stabilization Removal Continuous Concrete Edging Fall Cleanups Cut/Fill Weather Station Annual Displays Integrated Pest Management (IPM) Bark Application Dust Control Bollard Light Installation Drainage Restoration Underground Utility Installation Athletic Field Construction Driveway Base Slip-and-Fall Mitigation Smart Controller Integration Flow Sensor Install Paths Reporting Chimneys Drip Irrigation Installation Security Perimeter Lighting Mower-Edge Profiles Textured Borders Revegetation Vegetated Green Roof Maintenance SWPPP Compliance Hedge Planting Automated Lighting Control Systems Right-of-Way Clearing Blow-Outs Disposal Utility Trenching Mulch Bed Pre-Emergent Weed Treatment Flatwork Full-Scale Landscape Design Dedicated Site Staging Segmental Block Retaining Walls Emergency Storm Response Repair Urban Beautification Native Prairie Meadow Restoration Septic System Site Prep Commercial-Grade Curbing De-Icing Redefining Custom Integrated Lighting Liquid Brine Pre-Treatment Bed Preparation Real-Time Weather Monitoring ADA Compliance Upgrades Valve Maintenance Bio-Retention Cell Maintenance Garden Bed Definition PICP Natural Stone Patios Softscape Installation Invasive Species Management Land Clearing Commercial Turf Management Irrigation Pump Station Maintenance Ponds Seasonal Color Rotations Natural Stone Inlay Install Structural Retaining Walls Concrete Paving Hydroseeding Restoration Pipe Repair Weed Control 24/7 Zero-Tolerance Plowing Pressure Regulating Valve Installation Custom Irrigation System Design Overseeding Tree Ring Enclosure Water Feature Excavation Artificial Grass HOA Maintenance Backflow Prevention Testing Commercial Calibration Sealing Field Mowing Native Plant Design Hearths Irrigation System Retrofitting Bioswale Rain Garden Engineering De-Icing Optimization Pigmented Concrete Smart Central Control Systems Hedge Trimming Sidewalks Public Works Infrastructure Foundation Excavation Porter Services Hard Surface Maintenance Detention Ponds Relocation High-Volume Pumps Natural Boulder Retaining Walls Vegetation Management Creek Crossings Shrub Health Care Bi-Weekly Lawn Care Park & Playground Construction Approaches Energy Savings Architectural Accent Lighting Driveway Accents Slope Stabilization Removal Continuous Concrete Edging Fall Cleanups Cut/Fill Weather Station Annual Displays Integrated Pest Management (IPM) Bark Application Dust Control Bollard Light Installation Drainage Restoration Underground Utility Installation Athletic Field Construction Driveway Base Slip-and-Fall Mitigation Smart Controller Integration Flow Sensor Install Paths Reporting Chimneys Drip Irrigation Installation Security Perimeter Lighting Mower-Edge Profiles Textured Borders Revegetation Vegetated Green Roof Maintenance SWPPP Compliance Hedge Planting Automated Lighting Control Systems Right-of-Way Clearing Blow-Outs Disposal Utility Trenching Mulch Bed Pre-Emergent Weed Treatment Flatwork Full-Scale Landscape Design Dedicated Site Staging Segmental Block Retaining Walls Emergency Storm Response Repair Urban Beautification Native Prairie Meadow Restoration Septic System Site Prep Commercial-Grade Curbing De-Icing Redefining Custom Integrated Lighting Liquid Brine Pre-Treatment Bed Preparation Real-Time Weather Monitoring ADA Compliance Upgrades Valve Maintenance Bio-Retention Cell Maintenance Garden Bed Definition PICP Natural Stone Patios Softscape Installation Invasive Species Management Land Clearing Commercial Turf Management Irrigation Pump Station Maintenance Ponds Seasonal Color Rotations Natural Stone Inlay Install Structural Retaining Walls Concrete Paving Hydroseeding Restoration Pipe Repair Weed Control 24/7 Zero-Tolerance Plowing Pressure Regulating Valve Installation Custom Irrigation System Design Overseeding Tree Ring Enclosure Water Feature Excavation Artificial Grass HOA Maintenance Backflow Prevention Testing Commercial Calibration Sealing Field Mowing Native Plant Design Hearths Irrigation System Retrofitting Bioswale Rain Garden Engineering De-Icing Optimization Pigmented Concrete Smart Central Control Systems Hedge Trimming Sidewalks Public Works Infrastructure Foundation Excavation Porter Services Hard Surface Maintenance Detention Ponds Relocation High-Volume Pumps Natural Boulder Retaining Walls Vegetation Management Creek Crossings Shrub Health Care Bi-Weekly Lawn Care Park & Playground Construction Approaches Energy Savings Architectural Accent Lighting Driveway Accents Slope Stabilization Removal Continuous Concrete Edging Fall Cleanups Cut/Fill Weather Station Annual Displays Integrated Pest Management (IPM) Bark Application Dust Control Bollard Light Installation Drainage Restoration Underground Utility Installation Athletic Field Construction Driveway Base Slip-and-Fall Mitigation Smart Controller Integration Flow Sensor Install Paths Reporting Chimneys Drip Irrigation Installation Security Perimeter Lighting Mower-Edge Profiles Textured Borders Revegetation Vegetated Green Roof Maintenance SWPPP Compliance Hedge Planting Automated Lighting Control Systems Right-of-Way Clearing Blow-Outs Disposal Utility Trenching Mulch Bed Pre-Emergent Weed Treatment Flatwork Full-Scale Landscape Design Dedicated Site Staging Segmental Block Retaining Walls Emergency Storm Response Repair Urban Beautification Native Prairie Meadow Restoration Septic System Site Prep Commercial-Grade Curbing De-Icing Redefining Custom Integrated Lighting Liquid Brine Pre-Treatment Bed Preparation Real-Time Weather Monitoring ADA Compliance Upgrades Valve Maintenance Bio-Retention Cell Maintenance Garden Bed Definition
Stop It Before It Starts

Every rain event takes something
unless you stop it first.

North Idaho's spring snowmelt doesn't forgive unprepared slopes. From the steep shorelines of Coeur d'Alene to the gravel plains of Post Falls, a disturbed site without erosion controls can lose inches of topsoil in a single runoff event — topsoil that took centuries to form and costs hundreds per yard to replace. LP's erosion control work is fundamentally about keeping the soil where the grading put it.

LP installs the full range of sediment and erosion controls — silt fence, erosion control blankets, straw wattles, check dams, rock riprap, and hydroseeding — to the standards Kootenai County inspectors and Idaho DEQ require. We work on construction sites, residential slopes, and stream-adjacent properties throughout Post Falls, CDA, Hayden, Rathdrum, and the surrounding North Idaho communities.

Residential landscaping design and planting project featuring native palette planning supporting balanced texture and depth in Post Falls, Coeur d'Alene, and North Idaho
Why Erosion Control Matters

Protect your site, your topsoil,
and your permit status.

Kootenai County Permit Compliance

Erosion control is not optional on most North Idaho construction sites. Idaho DEQ's IPDES construction general permit requires a Stormwater Pollution Prevention Plan (SWPPP) and proper erosion control BMPs for sites disturbing more than 1 acre. LP implements the field-installed best management practices (BMPs) that satisfy inspector requirements and prevent stop-work orders.

Protect Topsoil During Spring Runoff

North Idaho's snowmelt season (March–May) concentrates more erosive energy into 8 weeks than most regions see in a year. A disturbed site without erosion controls during spring runoff can lose 2–6 inches of topsoil in a single season. LP's erosion controls installed before winter prevent the expensive topsoil loss and grading rework that uncontrolled runoff causes.

Bank Stabilization on Sloped Properties

North Idaho's terrain includes many residential properties on slopes, ravines, or adjacent to natural drainage channels. Uncontrolled bank erosion undercuts foundations, destroys landscaping, and eventually results in significant slope failures. LP stabilizes eroding banks through a combination of hard armoring, root-system establishment, and engineered drainage diversions.

Post-Construction Revegetation & Final Signoff

Erosion controls are not permanent — they're temporary measures until vegetation re-establishes. LP's post-construction revegetation service bridges the gap between construction completion and final permit signoff by establishing healthy vegetative cover that replaces the temporary controls. LP coordinates with project owners on the timing and documentation needed for permit closure.

Systems & Methods

Assess, install, revegetate —
the complete erosion control sequence.

01

Site Assessment & Erosion Risk Mapping

LP begins every erosion control project by walking the site and identifying the source areas: where runoff originates, the drainage pathway it follows, where sediment is being deposited, and whether the problem is surface sheet erosion, concentrated flow erosion, or bank erosion. Each erosion type has different best-practice solutions. LP maps the risk areas before specifying any material.

02

Silt Fence Installation

Silt fence is the industry-standard sediment control for active construction and disturbed-soil areas. LP installs silt fence correctly: fabric keyed into a 6-inch trench, posts at 8-foot centers, fabric secured tight to posts without sagging. Kootenai County and Idaho Department of Environmental Quality require silt fence for most construction disturbances over 1 acre and in proximity to water bodies. LP installs to IDAPA permit standards.

03

Erosion Control Blankets & Mats

Erosion control blankets (ECBs) protect disturbed slopes from raindrop impact and surface flow while establishing vegetation. LP installs biodegradable ECBs (straw, coco, or excelsior fiber) for most residential slopes and heavier polypropylene mats for permanent channel and steep slope applications. ECBs must be installed correctly — stapled in a specific pattern, seams overlapped — or they fail at the first rain event.

04

Straw Wattles & Check Dams

On moderate slopes and disturbed channels, straw wattles (tube-style sediment barriers) and rock check dams slow water velocity and allow suspended sediment to drop out before leaving the site. LP uses straw wattles for cross-slope barriers and rock check dams for concentrated drainage channels and swales. Check dam sizing is based on drainage area and expected runoff volume.

05

Hydroseeding with Erosion-Binding Tackifier

After mechanical erosion controls are installed, revegetation is the permanent solution. LP hydro-seeds disturbed areas with seed mixes appropriate for North Idaho conditions: soil-binding native grasses, erosion-specific annuals for immediate cover, and perennial grass mixes for long-term establishment. All LP hydroseeding for erosion control uses a bonded fiber matrix or tackifier to hold seed and mulch to the slope until germination.

06

Rock Riprap & Hard Armoring

For concentrated flow channels, stream banks, culvert outlets, and high-velocity drainage areas, vegetative solutions alone are insufficient. LP installs rock riprap (angular quarry rock placed to armor channel surfaces) and constructs rock-lined outlet structures at culvert and pipe discharge points. Riprap sizing is based on the design flow velocity and channel dimensions.

Recent Projects

Erosion control across North Idaho slopes and sites.

Native planting design — Post Falls, ID
Sod installation & irrigation — CDA residential
Wildflower hydroseeding project
Full landscape renovation — Hayden, ID
Common Questions

Frequently Asked Questions

When is erosion control required in Kootenai County?
Idaho DEQ requires erosion controls for any land disturbance over 1 acre under the IPDES Construction General Permit; Kootenai County also has local grading ordinance requirements; LP recommends erosion controls for any project disturbing soil on slopes greater than 5% or within 200 feet of a water body regardless of acreage.
What's the difference between silt fence, erosion control blankets, and check dams?
Silt fence is used at the site perimeter to catch sediment leaving a site; erosion control blankets protect slope surfaces from raindrop impact and sheet flow; check dams and wattles slow concentrated flow in drainage channels — most sites use all three in combination.
Can LP do erosion control work during winter or early spring?
LP can install silt fence and hard armoring (riprap) year-round; erosion control blankets can be installed in frozen conditions; hydroseeding is a late-spring application once soil temperatures reach 45°F+ for germination.
How much does erosion control cost?
Silt fence installation: $3–$6 per linear foot installed; erosion control blankets: $2,000–$6,000 per acre depending on slope and material; rock riprap and channel armoring varies widely with volume and haul distance; LP provides written estimates after site assessment.
Does LP pull erosion control permits?
LP can coordinate with the project's civil engineer or owner on SWPPP documentation; for small residential projects LP prepares the required BMP records; LP works under the owner's IPDES permit of record or can assist with contractor certification requirements.

Free Estimate

Don't let North Idaho's runoff season cost you topsoil.

Coeur d'Alene Post Falls Hayden Rathdrum Spirit Lake Dalton Gardens Athol Moscow Genesee Troy Potlatch Deary Sandpoint Ponderay Priest River Dover Kootenai Kellogg Pinehurst Osburn Wallace Smelterville St. Maries Plummer Coeur d'Alene Post Falls Hayden Rathdrum Spirit Lake Dalton Gardens Athol Moscow Genesee Troy Potlatch Deary Sandpoint Ponderay Priest River Dover Kootenai Kellogg Pinehurst Osburn Wallace Smelterville St. Maries Plummer Coeur d'Alene Post Falls Hayden Rathdrum Spirit Lake Dalton Gardens Athol Moscow Genesee Troy Potlatch Deary Sandpoint Ponderay Priest River Dover Kootenai Kellogg Pinehurst Osburn Wallace Smelterville St. Maries Plummer Coeur d'Alene Post Falls Hayden Rathdrum Spirit Lake Dalton Gardens Athol Moscow Genesee Troy Potlatch Deary Sandpoint Ponderay Priest River Dover Kootenai Kellogg Pinehurst Osburn Wallace Smelterville St. Maries Plummer